Emporia Power Monitoring Systems Installation Guide

Before Proceeding to install please Download & read the installation manual carefully.  

Emporia Vue Gen2 can be installed in 100 - 240 V ( Single or 3 phase ) Panels. Suitable for India

For Support Call 9831037220 or email us

WARNING! The Emporia Vue requires installing sensors inside your home’s electrical panel and working around dangerous voltage that could lead to injury or death. Emporia recommends that installation be performed by a licensed electrician or other qualified professional in accordance with the regional electrical code where it is being installed.

Improper installation or use of the equipment can be dangerous or even fatal. In no event shall Emporia be liable to you or any third party for any damages, either direct or indirect, arising from or related to any personal injury as a result of your failure to follow the safety information and instructions in this Installation Guide.

Safety Information

  •  Personal protective gear should be worn when installing the Emporia Vue.

  • Do not use the Emporia Vue in any manner other than specified in this installation guide.

  • Do not attempt to open, disassemble, or repair any of the components of the Emporia Vue.

  • If you believe any of the Emporia Vue components may have been damaged, do not attempt to use them.

  • Do not install the Emporia Vue in environments with explosive gas or vapors; nor in damp or wet environments; nor in direct sunlight; nor where temperatures are consistently below -40° F (-40° C) or above 122° F (50° C).


 

What’s in the box

Your new Emporia Vue contains the following items. If you believe that any of these items may have been damaged for any reason, do not attempt to use them and call support immediately. ( For India Single Phase Sets with One 200A CT also Available) 

 

 

Energy monitor connections

The energy monitor is the hub of the Emporia Vue. The 3.5mm A, B, and C ports on the top of the monitor are the inputs for the 200A main sensors (your bundle may only have included two). The coaxial connector for the WiFi cable is also on the top. The 2.5mm 1 through 16 ports on the sides of the monitor are the inputs for the 50A sensors (your bundle may have come with 16 or 8 sensors, or none at all). The port for the wiring harness is located on the bottom of the monitor. All of the ports are clearly labeled on the back of the energy monitor.

 

 

 

Step 1: Get the App

Use your phone to check the signal strength of your Wi-Fi network next to the electrical panel in your home. Low/no signal may require a Wi-Fi extender for the Vue to work. Download the Emporia Energy app onto your phone or tablet from the Apple App Store, from Google Play, or from emporiaenergy.com/app. Create an account and begin the setup process.

 

 

Step 2: Turn off the main breaker and remove the cover

In your electric panel, turn off the main breaker, although it may be located elsewhere in your house or you may not even have one. This turns off all the circuits in your home. Next, remove any screws holding the cover to the panel and remove the cover to access the circuit breakers and the live service mains!

 

Step 3: Find a place for the monitor

Locate a place within your electrical panel for your Vue energy monitor. Your breaker box may be oriented differently, but the monitor is small and designed to fit easily in the box. Find a place that works for you.

Step 4: Mount the antenna

Use a screwdriver to remove a knockout from inside the electrical panel. Connect the cable to the antenna and mount it with the knockout plug through the hole. It’s ok to install the antenna inside of a wall. Screw the cable to the top of the energy monitor in the jack marked . If possible, orient the antenna in the same direction as the antenna on your WiFi router.

Wifi Antenna

 

 

 Step 5: Plug in and connect the 200A current sensors

Your system will have 1, 2, or 3 main service cables (a typical 2-Phase mains) system is shown below, (However for India it can be Single or Three Phase Mains). Open the clasps on the sensors and place each sensor clamp around one of the main service cables. Then shut the clasps to secure the sensors. IMPORTANT! The K→L imprint on the bottom of the sensors should point toward the breakers. Then, insert the 200A current sensor plugs into the ports on the top of the energy monitor.

Plug in and connect the 200A current sensors

 

Step 6: Plug in the wire harness

Insert the power supply wiring harness into the bottom of the energy monitor until it clicks into place securely. The wire harness allows for single-phase power and three-phase voltage sensing: White connects to Neutral, Black provides power and voltage sensing, and Blue and Red enable voltage sensing only.

 

Plug in the wire harness

 Step 7: Wire the wire harness to a breaker and neutral bus

The wire harness will be connected differently depending on whether or not you have enough empty 15A breakers as well as the number of 200A clamps you installed in Step 5. Go to the step below based on your system. If you’re unsure, call Emporia Support and we’ll help you through it.

Or Download The Installation Manual PDF for Complete Details 

Incase you are fitting Three 200 A Main Sensors ( Three Phase ), Secure the White wire from the wire harness to the Neutral bus bar. Turn off three vertically adjacent (stacked) 15A single pole breakers and secure the Black, Red, and Blue wires from the harness to each of the hot leads from each breakers.

If you are fitting  Two 200 A Main Sensor ( Two Phase)Secure the White and Blue wires from the wire harness to the neutral bus bar. Turn off two vertically adjacent (stacked) 15A single pole breakers and remove their wires. Connect one of the breaker wires to the Black harness wire. Next, connect the second breaker wire to the Red harness wire. Then secure each of the extra wires to the two breaker poles.

Incase you are fitting only One 200 A SensorSecure the Red, White, and Blue wires from the wiring harness to the neutral bus bar. Turn off an empty 15A breaker and secure the Black wire from the harness to the hot lead from the breaker.

Three empty breakers and three 200A sensors

Incase the panel does not have extra Breakers/ MCBs You can connect the Wires with the Wire Nut ( included in package box ) as Shown below.

 

No empty breaker and three 200A sensors

 

Step 8: Plug in and connect the 50A current sensors

If your Vue Model has 50A sensors, open the clasps on the 50A sensors and place each sensor clamp around the hot leg from the breaker/MCB you wish to monitor. Then shut the clasps to secure the sensors. IMPORTANT! The K→L imprint on the bottom of the sensors should point away from the breakers. Then, insert the plugs attached to them into the 2.5mm ports on the sides of the energy monitor. Note the port numbers so you can name the circuits in the app.

 Plug in and connect the 50A current sensors

Step 8 (continued): A note about multi-pole breakers

If you wish to monitor 2- or 3-pole breakers/MCB typically for Appliances using 2 or 3 phase power, you can either use one sensor on each pole, or you can use a single sensor. To use a single sensor, clasp the clamp around either one of the hot leads coming off the breaker (it doesn’t matter which). You’ll then be able to input a circuit multiplier in the app to double or triple the reading by entering a “2” or “3.” We don't recommend multipliers for unbalanced loads, such as subpanels.

 

 Step 9: Replace the cover and turn on all breakers

Secure the cover to the box with any screws you removed in Step 2. Next, flip any breakers that you turned off during installation to restore power to the circuits in your home. You should hear a power up tone from the Vue to confirm it has power. Then, close the panel.

 Step 10: Complete setup

Tap the button in the app to indicate that you’ve installed your Emporia Vue, heard its power up tone, and you’re ready to proceed. Your phone will connect via Bluetooth to the system and then you’ll connect to a nearby Wi-Fi router. Make sure you have your Wi-Fi name and password.

 

Troubleshooting Tips

Q : The Emporia app is not finding my Vue after I’ve installed it.

Ensure the Vue has power: Check for a green power light.

  • Listen for a startup tone.
  • Check the wire harness is secure and wired properly.
  • Check that the main breaker is turned on. Check that the breaker powering the Vue is turned on.
Ensure your phone can connect to the Vue.
  • Check your phone’s Bluetooth is on. If you’re using an Android, turn on Location Services for your phone to properly scan for Bluetooth devices.
Ensure the Vue’s Wi-Fi antenna has been installed properly.
  • Check the antenna is properly screwed into the energy monitor
  • Ensure the antenna is outside of the electric panel. It’s ok if it is inside a wall, just ensure it’s not inside the metal box.
Try power cycling the breaker to which the Vue is connected.
Try restarting the Emporia App.
Try rebooting your phone.

    Q: The Emporia Energy app isn’t getting real-time data from the Emporia Vue

    • Ensure all current sensors are securely fastened around ttheir respective cables in your electric panel.
    • Check the current sensors are securely plugged into the energy monitor in ports.

    Technical Details

     

    The Vue energy monitor and current sensors are considered a system designed for field installation in a switch enclosure as per section 312.8(B) of the 2017 National Electrical Code (NEC) regarding Power Monitoring Equipment. The Vue is considered a non-invasive load monitor (NILM) and as a non-permanent fixture, it is acceptable to install in an electrical panel.

    The Emporia Vue Smart Home Energy Monitor contains FCC ID: 2AS6P-EMCTV2 This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. This equipment complies with FCC RF radiation exposure limits set forth for an uncontrolled environment. This equipment should be installed and operated with a minimum distance of 20 centimeters between the radiator and your body.

    Caution: Any changes or modifications not expressly approved by Emporia void the user's authority to operate the equipment.